3. Install the Cylinder Rotor Unit so that the inner hole of the
Cylinder Rotor Unit fits to the small projection (D) on top of the
Upper Cylinder.
4. Tighten 2 screws (B).
5. install the Cylinder Stator Unit.
6. Tighten 2 screws (A).
7. Confirm the PG SHIFTER ADJUSTMENT with the alignment tape
Fig. S6
Fig. S7
7