4-4 Appropriate Measures for Different Symptom
4-4-1 Outdoor Unit Operation Flow
4-46
Power On
Was commissioning completed?
Yes
Normal operation
No
Automatic commissioning carried out.
Commissioning if it is not running - UP is displayed
Prior to starting the air conditioning operation after the ini-
tial installation and automatic commissioning is carried out.
This process, the stable operation to protect the system and verify
the defect of the product.
1. Tracking is complete and after the initial installation, if you do
not have a history of commissioning is completed, UP will be dis-
played.
2. Execute the automatic commissioning by Tact Switch.
3. UP display disappears after commissioning is complete, normal
operation is possible.
4. Automatic commissioning is completed, if there is a history, nor-
mal operation execution immediately.
LED display the UP(Unprepared)
When commissioning is complete,
the UP display disappears.