Page 1
SmartLogger3000 User Manual Issue Date 2020-01-10 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document introduces the SmartLogger3000 (SmartLogger for short) and SmartModule1000 (SmartModule for short) in terms of installation, electrical connections, system operation and maintenance, and troubleshooting. Understand the SmartLogger and SmartModule features, functions, and safety precautions provided in this document before installing and operating the SmartLogger and SmartModule.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
Use tools correctly to avoid hurting people or damaging the equipment. 1.2 Personnel Requirements Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
Page 17
− Power meters that use the DL/T645 protocol − Devices that use the IEC103 protocol MBUS networking, which enables the SmartLogger to connect to Huawei solar inverters and PID-PVBOXs that support MBUS communication Connection to management systems: −...
The SmartModule applies to PV power systems. It supports the following: RS485 networking, which enables the SmartModule to connect to: − Huawei devices such as solar inverters and PID modules Third-party solar inverters, EMIs, transformer stations, and power meters that use − the Modbus-RTU protocol −...
Context The SmartLogger supports the deployment wizard for setting basic SmartLogger parameters, connecting Huawei devices, power meters, and EMIs, configuring Huawei NMS, configuring third-party NMS, and interworking with third-party devices. After the SmartModule communicates with the SmartLogger properly, the SmartLogger automatically identifies the SmartModule.
Page 85
6 WebUI Operations Step 2 Set management system parameters. Method 1: When the SmartLogger connects to a Huawei or third-party management system using the encrypted Modbus TCP protocol, set management system parameters and click Submit. Figure 6-9 Setting management system parameters...
Page 86
(non-secure protocol). Users are advised to take measures at the PV plant level to reduce security risks, or use Huawei management system to mitigate the risks. To use this function, set this parameter to Enable(Limited) or Enable(Unlimited).
Page 87
(non-secure protocol). Users are advised to take measures at the PV plant level to reduce security risks, or use Huawei management system to mitigate the risks. To use this function, set this parameter to Enable(Limited) or Enable(Unlimited).
Select PV/PE if the PID module is required to use voltage output from the negative PV terminal. This mode is applicable only to Huawei SUN8000. In the SUN2000 scenario, Automatic indicates the N/PE offset mode.
Page 121
The protocol information points vary depending on vendors. Therefore, you need to obtain a protocol information file in .cfg format from Huawei and import the file into the SmartLogger for successfully connecting to a custom device.
Page 147
3. Manually add the devices that cannot be detected automatically, such as the EMI and power meter. 4. Contact the dealer or Huawei technical support. 1. The solar inverter and SmartLogger 1. Check whether the solar inverter and do not support MBUS.
Page 148
5. Power on the SmartLogger and its connected device. 6. Check the RS485 communications parameter settings. 7. Contact the dealer or Huawei technical support. 1. The SIM card is not inserted or it is in 1. Insert or replace the SIM card.
Exports the license you want to apply for a license. application file. 2. Click Export License Appli File. 3. Purchase a license from Huawei and obtain the license file from Huawei technical support engineers. 1. Click Upload License. License loading...
Page 162
Step 1 Log in to the app. (Connecting the SmartLogger to the FusionSolar Hosting Cloud) Open the FusionSolar app, log in to intl.fusionsolar.huawei.com as installer account, and choose My > Device commissioning to connect to the WLAN hotspot of the SmartLogger.
Users are liable for any loss caused by the enabling of the FTP protocol (non-secure protocol). Users are advised to take measures at the PV plant level to reduce security risks, or use Huawei management system to mitigate the risks. Procedure Step 1 Set FTP parameters and click Submit.
----End 8.9 How Do I Change the Communications Address? The SmartLogger allows you to change the communications addresses of Huawei devices on the Connect Device or Device List page. Changing the Communications Address on the Connect Device Page Step 1 Choose Maintenance >...