5. 5.
Outdoor Units installation
Outdoor Units installation
14. Completing the Installation and Commissioning
14. Completing the Installation and
1) Check List
1) Check List
Are the outdoor and indoor unit fixed securely?
Are the outdoor and indoor unit fixed securely?
Is the place well-ventilated and ensures space for service?
Is the place well-ventilated and ensures space for service?
Is total number of connecting indoor units in the allowable range?
Is total number of connecting indoor units in
Are the
Are
the length
length and
allowable range?
allowable range?
Is the ref. and drain properly insulated?
Is the ref. and drain properly insulated?
Have you completed the gas leak and drain test?
Have you completed the gas leak and drain test?
Is the wiring route correct?
Is the wiring route correct?
Have you performed the earth work to the
Have you performed the earth work to the outdoor unit?
Are wiring
Are
wiring specifications
standards?
standards?
Is the length of the wire is in the limited range?
Is the length of the wire is in the limited range?
Have you completed the drain test?
Have you completed the drain test?
Are the addresses of the indoor and outdoor units properly set?
Are the addresses of the indoor and outdoor units properly set?
Is the switch setting of the i
Is the switch setting of the indoor units for centralized control properly made?
Have you written the installation check card?
Have you written the installation check card?
Contents
Contents
and the
the difference
difference between
specifications according
according to to the
ndoor units for centralized control properly made?
135
135
the allowable range?
between the
the refrigerant
refrigerant pipes
outdoor unit?
the installation
installation manual
manual and
Commissioning
pipes within
within the
the
and national
national
Check
Check