Safety Information BEFORE YOU BEGIN CONTENTS Design Information Read these instructions completely and carefully. Models Available ..............2 IMPORTANT Save these instructions Product Dimensions and Clearances ......4 for local inspector’s use. Tools Required ................4 Parts Supplied ................4 IMPORTANT Observe all governing codes Installation Preparation and ordinances.
Page 3
Información de seguridad ANTES DE COMENZAR Lea estas instrucciones por completo y con detenimiento. IMPORTANTE Guarde estas instrucciones para el uso de inspectores locales. IMPORTANTE Cumpla con todos los códigos y ordenanzas vigentes. Nota al instalador Asegúrese de dejar estas instrucciones con el Consumidor.
Design Information PRODUCT DIMENSIONS AND CLEARANCES 29-3/4” With Optional Side Trim 22-9/16” 26-3/4” 1-1/8” 21-1/2” 18-5/8” 13” 1-1/16” 13/16” TOOLS AND PARTS REQUIRED PARTS SUPPLIED 6 screws (3 required, 3 extra) (NOT SUPPLIED 5 color-matched screws (4 required, 1 extra) #2 Phillips screwdriver 2 side trim pieces Hand-held drill...
Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120-volt, 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. National Electrical Code or the prevailing local code for this kilowatt rating.
Installation Preparation PREPARE THE OPENING PREPARE THE OPENING (CONT.) The Advantium 120 can be installed in combination Installation over a GE/Monogram with other GE/Monogram appliances. Always follow Warming Drawer: each product’s Installation Instructions to complete 23-1/2” Construct 27” or 30”...
2” Min. 45-1/4” Min. 9-1/4” * If you are replacing a GE/Monogram electric NOTE: Additional clearances between the cutouts double oven with the combined installation of may be required. Check to be sure the oven an Advantium 120 and a single oven, use the supports above the Warming Drawer location does dimensions shown.
Installation STEP 1 SLIDE THE OVEN INTO STEP 2 INSTALL BOTTOM TRIM THE CUTOUT oven. CAUTION: Two people are required to lift the oven into the opening. Grasp the bottom at the front and rear. DO NOT USE THE HANDLE TO LIFT THE OVEN. DAMAGE WILL OCCUR! MISE EN GARDE : Deux personnes sont...
Installation STEP 3 INSTALL SIDE TRIM STEP 4 INSTALL MOUNTING SCREWS FOR 30” CABINET INSTALLATION ONLY. SKIP THIS STEP IF YOU HAVE 27” WIDE CABINETRY. side. oven flange.The screw holes in the side trim should align with the holes in the oven flange. (and side trim, if applied).
Page 10
Accessory Storage Drawer PREPARE THE OPENING PREPARE THE OPENING (cont.) The Advantium 120V can be installed in Installation over a GE/Monogram combination with other GE/Monogram appliances. Warming Drawer: Always follow each product’s Installation 23-1/2 Instructions to complete the installation.
Page 11
Installation Preparation WITHOUT Preparation an Accessory Storage Drawer PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over a GE/Monogram oven: Installation over a GE/Monogram Oven and Warming Drawer: 23-1/2 23-1/2 Construct Solid Construct Solid Bottom Min. Bottom Min. 3/8 Plywood...
Page 12
NOTE: While performing installations described in this book, GE Appliances & Lighting safety glasses or goggles should be worn. Appliances NOTE: Product improvement is a continuing endeavor at General Electric Company General Electric. Therefore, materials, appearance and Louisville, KY 40225 specifications are subject to change without notice.