hit counter code
Download Print this page
Cisco SKY-MOD10G-A Hardware Installation Manual
Cisco SKY-MOD10G-A Hardware Installation Manual

Cisco SKY-MOD10G-A Hardware Installation Manual

Provider connectivity assurance sensor module 10g

Advertisement

Quick Links

Cisco Provider Connectivity Assurance Sensor Module 10G Hardware
Installation Guide
First Published: 2024-09-13
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Advertisement

loading

Summary of Contents for Cisco SKY-MOD10G-A

  • Page 1 Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide First Published: 2024-09-13 Americas Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 http://www.cisco.com Tel: 408 526-4000 800 553-NETS (6387) Fax: 408 527-0883...
  • Page 2 Cisco has more than 200 offices worldwide. Addresses and phone numbers are listed on the Cisco website at www.cisco.com/go/offices. Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL: https://www.cisco.com/c/en/us/about/legal/trademarks.html.
  • Page 3 Site Considerations Power Supply Considerations Rack Configuration Considerations C H A P T E R 3 Mount the Chassis Unpack and Inspect the Chassis Wall-Mount the Chassis Rack-Mount the Chassis Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 4 Power the Unit via the AC Power Supply Power the Unit via DC Power Cable Power the Unit via DC Terminal Block Adapter Connect to the Network Remove and Replace the Fan Tray Replace the Fan Tray Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 5 Layer 2 through 4 testing and traffic generation—without compromising performance, scalability, and precision. This makes Assurance Sensor Modules an ideal fit for cost- and space-sensitive applications where performance is a key service differentiator. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 6 • Rubber feet (4x) • L-bracket kit (1x) • Cisco Provider Connectivity Assurance Sensor Module 10G—This document contains URLs that point to the hardware installation guide, regulatory compliance and safety information guide, warranty, and licensing pages, and a QR code that points to the management center Documentation Portal...
  • Page 7 Optical port 1 Optical port 2 SFP 1G/10G Ethernet port 1 SFP 1G/10G Ethernet port 2 Front Panel LEDs The following figure shows the front panel LEDs and describes their states. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 8 • Fast flashing means a critical system failure is detected. Rear Panel The following figure shows the rear panel of the Sensor Module 10G - AC Input Power Model. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 9 Connect appropriate power cord here The following figure shows the rear panel of the Sensor Module 10G - DC Input Power Model. Figure 5: Sensor Module 10G Rear Panel - DC Input Power Model Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 10 *Cold Start: -13°F (-25°C) Storage: -40 to 158°F (-40 to 70°C) Humidity Operating: 5 to 85% RH, noncondensing Storage: 5 to 95% RH, noncondensing Altitude 6562 ft (2000 m), above sea level Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 11 India – C5 termination SKY-PC-SIN Singapore – C5 termination SKY-PC-AUS Australia / New Zealand – C5 termination SKY-PC-SWI Switzerland – C5 termination SKY-PC-ITA Italy – C5 termination SKY-PC-ISL Israel – C5 termination Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 12 Brazil – C5 termination SKY-PC-C20 C20 – C5 termination SKY-PC-C14 C14 – C5 termination SKY-PC-CHN China – C5 termination Note Only the approved power cords for the Sensor Module 10G are supported. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 13 Use the statement number at the beginning of each warning statement to locate its translation in the translated safety warnings for this device. SAVE THESE INSTRUCTIONS Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 14 Only an instructed person or skilled person should be allowed to install, replace, or service this equipment. See statement 1089 for the definition of an instructed or skilled person. There are no serviceable parts inside. To avoid risk of electric shock, do not open. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 15 • The chassis is equipped with an AC-input power supply, which is shipped with a three-wire electrical cord with a grounding-type plug that fits into a grounding-type power outlet only. Do not circumvent this safety feature. Equipment grounding should comply with local and national electrical codes. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 16 • Check the power at the site before installing the chassis to ensure that it is free of spikes and noise. Install a power conditioner, if necessary, to ensure proper voltages and power levels in the appliance-input voltage. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 17 • Baffles can help to isolate exhaust air from intake air, which also helps to draw cooling air through the chassis. The best placement of the baffles depends on the airflow patterns in the rack. Experiment with different arrangements to position the baffles effectively. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 18 Installation Preparation Rack Configuration Considerations Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 19 Check for damage and report any discrepancies or damage to your customer service representative. Have the following information ready: • Invoice number of shipper (see the packing slip) • Model and serial number of the damaged unit • Description of damage Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 20 NEBS Seismic Zone 4 compliant rack. Such screws are not provided with the bracket kit. To rack-mount the chassis: Step 1 Secure two L-shaped mounting brackets vertically to both sides of each Module using the provided screws. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 21 Secure the rack-mount bracket to the rack using the fasteners as recommended by the manufacturer. Ground the Chassis Note Statement 7013 Equipment Grounding Systems—Common Bonding Network (CBN) This equipment is suitable for installations using the CBN. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 22 Statement 8016 Installation Location Where the National Electric Code (NEC) Applies This equipment is suitable for installation in locations where the NEC applies. Warning For optimal performance, connect the functional ground screw to a suitable grounding point before applying power. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 23 Plug the power cord into a suitable power outlet. The power LED will light, indicating that the Module is powered. Power the Unit via DC Power Cable Safety Warnings Take note of the following warning: Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 24 Establish the proper connections between the cable end and the power sources. Step 2 Connect the DC connector to the back of the Module. Figure 9: Connect the DC Connector Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 25 Figure 10: Fasten the Terminal Block Adapter Step 2 Establish the proper connections between the wires and the power sources. Step 3 Connect wires to the terminal block connector of the adapter. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 26 You must read and follow these guidelines before you begin. • Power to the unit remains on throughout this process. • To avoid personal injury, equipment damage and/or service interruptions, keep your fingers away from the fan's moving parts. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 27 Risk of personal injury. Avoid sharp edges when installing or removing replaceable units. Replace the Fan Tray You will need: • Replacement fan tray • Module 10G • Slotted #1 Phillips screwdriver Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 28 To replace the fan tray: Step 1 With the Module 10G front facing you, use a screwdriver to loosen the screws to the right and left of the fan tray. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 29 Slide the fan tray towards you to remove it. You do not need to keep this piece; place it in the appropriate electronic recycling. Step 3 Take the new replacement fan tray and slide it into the Module 10G. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...
  • Page 30 Replace the Fan Tray Figure 13: Slide the Replacement Fan Tray into the Module 10G Step 4 Tighten the right and left screws to secure the replacement fan tray to the Module 10G. Cisco Provider Connectivity Assurance Sensor Module 10G Hardware Installation Guide...

This manual is also suitable for:

Sky-mod10g-ddSky-mod10g-h-ddSky-mod10g-h-a